Traffic figures are reported using data from the bridge’s Weigh in Motion (WiM) station.The WiM station was originally installed to monitor loading on the bridge. Plates in the carriageway capture and record the number and weight of vehicles as they drive over a sensor. Overall counting accuracy is comparable with other traffic counting loops on the road network. However, some very light vehicles may not be detected, and figures can be skewed during roadworks, as traffic in some contraflow layouts does not drive over the WiM station in one direction.

2009 Traffic - Forth Road Bridge

Click on totals for daily figure

Month Northbound Southbound Total
January 901,503  948,394
1,849,897
February 537,141*  543,519* 1,080,660*
March 759,573  778,099 1,537,672†
April 1,033,409  1,074,902 2,108,311
May 1,065,908
 1,134,409 2,200,317
June 1,079,574 1,121,183
 2,200,757
July  1,124,262 1,166,964
2,291,226
August 634,836
358,536
 993,372**
September 483,976 261,222 
 745198***
October 217,181 113,566
330,747*†
November
 -  ****
December 891,333
 877,855  1,769,188
Total 8,728,396 8,378,649 17,107,045

 

* NOTE: Due to a fault on the WIM plate there was no data recorded for 4-5, 13-16 or 21-22 February.

† NOTE: Due to a fault on the WIM plate there was no data recorded for 6th - 9th March.

** NOTE:  WIM Data was unavailable between 14/08/09 & 28/08/09

*** NOTE:  WIM data was unavailable between 04/09/09 & 10/09/09 and 20/09/09 & 30/09/09

*† NOTE:  WIM Data unavailable between 01/10/09 & 16/10/09 and 24/10/09 and 31/10/09

**** NOTE:  WIM data was unavailable during November